Mold cleaning is usually done using chemical soaking, ultrasonics, sandblasting (plastic beads or cryogenic temperatures), and hand-held hand tools. The mold cleaning process is still a well-known problem. The efficiency is not always high, the cost is often expensive, and sometimes it generates a lot of noise, or endangers the safety of the operator. The use of different technologies is not entirely satisfactory.
The
The mold cleaning machine adopts high-speed high-pressure water-gas mixing technology, mixing high-pressure air in high-speed water flow. The bubbled compressed air locally generates a blasting impact under the pressure of a high-speed water stream. At the same time, the machine is fused into positive and negative two-way rinsing, which impacts the attachments and corrosive substances on the blasting wall, and the high-speed flow removes the dirt from the pipeline.
The
Mold cleaning machine installation and use instructions:
The
(1) Acceptance of the construction of the equipment foundation The quality inspector of the construction department shall perform the inspection and acceptance together with the civil construction worker and fill out the construction acceptance checklist. The basic construction quality must meet the basic drawings and technical requirements.
The
(2) The final acceptance of the equipment installation project shall be conducted after the equipment is qualified for commissioning. The equipment management department and the process technology department together with other departments, involved in the installation, inspection, security, use and other relevant personnel to participate in the acceptance, make an assessment, fill in the installation and construction quality, accuracy inspection, safety performance, test run records, etc. The voucher and acceptance transfer order may be signed by all parties involved in the inspection.
The
(3) After the mold cleaning machine has passed the acceptance check
The
The equipment unpacking and acceptance (or equipment installation and transfer acceptance check) and equipment operation test record sheet are signed by the parties involved in the inspection and the technical documents brought by the equipment, and are incorporated into the equipment file management by the equipment management department; along with the equipment accessories, For spare parts, a spare part warehouse receipt should be completed and sent to the equipment warehouse for storage. The safety management department should document the safety issues in the installation test.
The
(4) After the transfer of the mold cleaning machine is completed, the equipment management department shall sign the notice of equipment production and send the copy to the equipment management department, the use unit, the financial department, and the production management department as the archiving, notification and use, and the fixed asset management certificate. The basis of the assessment project plan.